|
 |
Here we take a tour of the Burlington Northern Railroad from its 1970 merging of its four components right up to the time
before merger with the Santa Fe Railway. Sample freight schedules, passenger schedules, diesel rosters will be among the materials
featured.
|
 |
1970 Profile of the Burlington Northern Railroad
Mileage: 23,609
Locomotives: 1973
Passenger Cars: 1171
Freight Cars: 116,491
Company Service Cars: 8256
Major Terminals: Chicago (Cicero),Galesburg,Northtown(TwinCities),Denver,Pasco, Spokane,Yakima,Seattle,Portland,Fort Worth-Dallas.
The Burlington Northern Railroad was formed on March 1,1970 as a result of the merging of the Chicago,Burlington &Quincy,Great
Northern,Northern Pacific,Spokane,Portland and Seattle and Pacific Coast railroads into a single railroad that blanketed much
of the northwestertn United States. At this time,the California Zephyr passenger train was in its final weeks as a through
service operation to and from Oakland,California as Western Pacific was to drop its portion 3 weeks later. Other fine passenger
trains that the four major railroads brought to the merger were The Empire Builder,Western Star,North Coast Limited,Main
Streeter,Denver Zephyr, Twin Zephyrs,and of course, the tripartite California Zephyr. Of these trains, the Empire Builder,Denver
Zephyr, all made it to Amtrak on May 1,1971, though the North Coast Limited wasn't among them at first. This train was
brought back as the North Coast Hiawatha,since the Chicago-Twin Cities portion of the route was via the Milwaukee Road instead
of BN between those points even though BN equipment continued to be used.
The passenger services of what had been four railroads were contained in a single system timetable with a cascade green
cover. This was issued on April 26,1970. The second and last BN system passenger timetable was issued October 25,1970. With
a map on the cover, this timetable was just as attractive as the earlier edition. More on the passenger and commuter operations
later. On the freight side of the coin, schedules and blockings of trains were revised as were the routes travelled by some
trains.
|
 |
|
 |
|
 |
|
|
SCHEDULES,ROSTERS, AND OTHER INFORMATION. In this section, sample freight schedules, diesel rosters and other similar information
will be found. To get the train rolling down the tracks we shall begin with a few 1981 sample freight schedules.
Table1A.Chicago-Seattle-Pasco-Portland Westbound
Stations 85 97 57 197 83
Chicago L 2110 0230 ---- 1430 ---
GalesburgL ----- --- 2000 ---- ----
Minneapolis 0925 ---- ---- ---- ----
Minneapolis 1425 ----- ---- ----- 2200
Jamestown,ND 2320 ------ ---- ---- -----
Billings,MT 1420 ----- ---- ---- -----
Laurel 1450 ----- ---- ---- -----
Laurel 1745 ----- ---- ---- -----
Missoula 1115 ----- ---- ---- ----
Minot,ND ---- 0545 0300 1515 1600
Minot,ND ---- 0945 ----- 2230 2330
Spokane,WA 2030 ---- ----- ---- 1830
Wenatchee ---- ---- ---- ---- ----
Everette ---- 1925 ---- ---- ----
Seattle ---- 2040 ----- ---- ----
Pasco 0315 ----- ----- 1230 0330
Portland ---- ----- ----- 2359 ----
Tacoma ---- ---- ---- ---- ----
TABLE 1b Seattle-Portland-Spokane-Minneapolis-Chicago
Stations 82 182 88 84 86
Tacoma L ---- ---- 0002 ----- ---
Seattle L 2230 ---- 0600 ---- ----
Everett 2330 ---- 0730 ---- ----
Wenatchee 0515 ---- 1430 ---- ----
Hoquiam ----- 0530 ----- ----- ----
Yakima ---- ---- ----- ---- ----
Pasco A ----- 0030 ---- ---- ----
Pasco L ---- 0700 ---- ---- ----
Spokane ---- 1145 2200 1600 ----
Missoula ----- ---- ---- 2220 2330
Laurel ---- ---- ---- ---- 1400
Billings ---- ---- ---- ---- 1500
Minneapolis A 0330 0450 2340 0125 2210
Minneapolis L 0915 1000 ---- ---- ----
Chicago A 2245 2330 ---- ---- ----
Table 2. TOFC Service- Westbound
Stations 33......3.....23......43
Chicago ----....1400..2330...-----
Minneapolis ----....0045..----...----
Spokane A ----....1005 1945 -----
Spokane L 1120....1105..2115...2045
Seattle A ----....2145..----...0745
Portland A ----....----..0645...----
Table 2B. Eastbound TOFC Service
Stations............4.......PBF/182
Portland L.......----.......1800
Seattle L.......1930......-----
Spokane A.......----......1115
Spokane L.......----......1145
Minneapolis A.....----......0450
Chicago A.......1500......2330
These were just a few of the several hundred freight trains operating each day throughout the Burlington Northern system.
All trains handled TOFC traffic as well as carload traffic, except those trains designated as TOFC/COFC only.
PASSENGER SCHEDULES OF BN COMPONENTS.
Table3.Great Northern Condensed 1969 Schedule for Nos31 and 32 THE EMPIRE BUILDER and Nos.27 and 28 THE WESTERN STAR.
27.......31.......Stations........32..........28
----- 1300...Lv Chicago..Ar....1455........-----
-----..2000...Ar St.Paul..Lv....0810........-----
0830...2035...Lv St.Paul..Ar....0710........1830
0855...2100...Ar Minneapolis.Lv.0635........1800
0905...2105...Lv Minneapolis.Ar.0630........1750
1045...2238...Ar Willmar.....Lv.0430........1610
1050...2240...Lv Willmar.....Ar.0425........1605
1335...0117...Ar Fargo,ND....Lv.0100........1310
1350...0130...Lv Fargo,ND....Ar.0050........1300
1935...0500...Ar Minot,ND....Lv.2105........0710
1950...0510...Lv Minot,ND....Ar.2050........0655
2205...0725...Ar Williston...Lv.1835........0425
2120...0635...Lv Williston...Ar.1725........0315
0240...1135...Ar Havre,MT....Lv.1220........2100
0300...1150...Lv Havre,MT....Ar.1205........2040
0900...1800...Ar White Fish..Lv.0610........1430
0910...1805...Lv White Fish..Ar.0600........1420
1415...2315...Ar Spokane,WA..Lv.2310........0716
1500...2345...Lv Spokane,WA..Ar.2240........0615
1830...0310...Ar Wenatchee...Lv.1918........0220
1840...0320...Lv Wenatchee...Ar.1910........0205
2300...0745...Ar Seattle,WA..Lv.1500........2200
Table4A.BURLINGTON ROUTE.Chicago to Denver. 1969 Timetable
Westbound Service.
Stations.........11.....17.......1........3
Chicago Lv.....1100..1440.....1735....2115
Galesburg Ar....1355..1710.....2008....0030
Galesburg Lv....1405..1712.....2010....0050
Ottumwa,IA Ar...1608..1909.....2204....0308
Ottumwa,IA Lv...1612..1916.....2206....0328
Creston....Ar...1756..2048.....2345....0523
Creston....Lv...1756..2048.....2345....0523
Omaha,NE...Ar...2000..2245.....0129....0745
Omaha,NE...Lv...----..2305.....0139....0815
Lincoln....Ar...----..0005.....0239....0915
Lincoln....Lv...----..0020.....0304....----
Hastings...Ar...----..0158.....0440....----
Hastings...Lv...----..0208.....0448....----
McCook.....Ar...----..0425.....0645....----
McCook.....Lv...----..0448.....0549....----
Denver,CO..Ar...----..0800.....0800....----
Table4B. Denver to Chicago
Stations.......2..........18........12........4
Denver....Lv.1500.......1920......------....----
McCook....Ar.1830.......2313......------....----
McCook....Lv.1934.......0022......-----.....----
Hastings..Ar.2142.......0235......-----.....----
Hastings..Lv.2148.......0244......-----.....----
Lincoln...Ar.2305.......0424......-----.....----
Lincoln...Lv.2329.......0434......-----.....1830
Omaha.....Ar.0026.......0534......-----.....1930
Omaha.....Lv.0036.......0554......1210......1955
Creston...Ar.0220.......0740......1400......2159
Creston...Lv.0220.......0740......1400......2159
Ottumwa...Ar.0358.......0918......1545......2340
Ottumwa...Lv.0400.......0920......1550......2340
Galesburg Ar.0559.......1124......1800......0205
Galesburg Lv.0602.......1126......1830......0225
Chicago...ar.0850.......1405......2140......0530
Note: These schedules do not comprise all the service Burlington operated on this route,but just the principal trains
going beyond Ottumwa,Iowa. They were issued 4-27-69.
BLOCKINGS FOR SOME OF THE TRAINS SHOWN HERE:
Train 3, High priority freight was blocked as follows:
CHICAGO
1.Everett, CL (fill)
2.Carload (Fill)
3.Portland, TCF
4.Seattle, TCF
5.Spokane,TCF
6.Fargo,TCF
7.Caboose
NORTHTOWN: Pick up on rear ahead of Group 4.
Grouping:
1.Spokane
2.Portland
3.Seattle
At Fargo: Set off Group 6.Yardley,Set off Spokane TCF,
Deliver Portland traffic to Train 33.
Grouping for Train No.4
1.Chicago and beyond, TOFC/COFC
1.Chicago TOFC/COFC
2.Caboose
Blocking data came from 1982 BN Freight Schedule book in my library.
|
|
|
 |