                     | Here we take a tour of the Burlington Northern Railroad from its 1970 merging of its four components right up to the time
                           before merger with the Santa Fe Railway. Sample freight schedules, passenger schedules, diesel rosters will be among the materials
                           featured.
                           
 |  
                     |  |  
                     | 
                           
                              | 1970 Profile of the Burlington Northern Railroad
                                    
 Mileage: 23,609
 
 Locomotives: 1973
 
 Passenger Cars: 1171
 
 Freight Cars: 116,491
 
 Company Service Cars: 8256
 
 Major Terminals: Chicago (Cicero),Galesburg,Northtown(TwinCities),Denver,Pasco, Spokane,Yakima,Seattle,Portland,Fort Worth-Dallas.
 The Burlington Northern Railroad was formed on March 1,1970 as a result of the merging of  the Chicago,Burlington &Quincy,Great
                                    Northern,Northern Pacific,Spokane,Portland and Seattle and Pacific Coast railroads into a single railroad that blanketed much
                                    of the northwestertn United States. At this time,the California Zephyr passenger train was in its final weeks as a through
                                    service operation to and from Oakland,California as Western Pacific was to drop its portion 3 weeks later. Other fine passenger
                                    trains that the four major  railroads brought to the merger were The Empire Builder,Western  Star,North Coast Limited,Main
                                    Streeter,Denver Zephyr, Twin Zephyrs,and of course, the tripartite California  Zephyr. Of these  trains,  the Empire Builder,Denver
                                    Zephyr,  all made it to  Amtrak  on May 1,1971, though the North Coast Limited wasn't among them at first. This train was
                                    brought back as the North Coast Hiawatha,since the Chicago-Twin Cities portion of the route was via the Milwaukee Road instead
                                     of  BN between those points even though BN equipment continued to be used.
 The passenger services of what had been four railroads were contained in a single system timetable with a cascade green
                                    cover. This was issued on April 26,1970. The second  and last BN system  passenger timetable was issued October 25,1970. With
                                    a map on the cover, this timetable was just  as attractive as the  earlier  edition. More on the passenger and commuter operations
                                    later.  On the freight side of the coin, schedules and blockings of trains were revised as were the routes travelled by some
                                    trains.
 |  
                              |  |  
                              |  |  
                              |  |  
                              |  |  
                              |  |  
                              |  |  |  
                     | 
                           
                              | SCHEDULES,ROSTERS, AND OTHER INFORMATION. In this section, sample freight schedules, diesel rosters and other similar information
                                    will be found. To get the train rolling down the tracks we shall begin with a few 1981 sample freight schedules.
                                    
 
 
 
 
 
 
 Table1A.Chicago-Seattle-Pasco-Portland  Westbound
 
 
 
 
 
 
 
 Stations        85       97     57    197     83
 
 Chicago  L    2110     0230    ----   1430    ---
 
 GalesburgL    -----     ---    2000   ----    ----
 
 Minneapolis   0925     ----    ----   ----    ----
 
 Minneapolis   1425     -----   ----   -----   2200
 
 Jamestown,ND  2320     ------  ----   ----    -----
 
 Billings,MT   1420     -----   ----   ----    -----
 
 Laurel        1450     -----   ----   ----    -----
 
 Laurel        1745    -----    ----   ----    -----
 
 Missoula      1115     -----   ----   ----     ----
 
 Minot,ND      ----     0545    0300   1515     1600
 
 Minot,ND      ----     0945    -----  2230     2330
 
 Spokane,WA    2030     ----    -----  ----     1830
 
 Wenatchee     ----     ----    ----   ----     ----
 
 Everette      ----     1925    ----   ----     ----
 
 Seattle       ----     2040    -----  ----     ----
 
 Pasco         0315     -----   -----  1230     0330
 
 Portland      ----     -----   -----  2359     ----
 
 Tacoma        ----     ----    ----   ----     ----
 
 TABLE 1b Seattle-Portland-Spokane-Minneapolis-Chicago
 
 Stations      82     182     88      84     86
 
 Tacoma  L    ----    ----   0002    -----  ---
 
 Seattle L    2230    ----   0600    ----   ----
 
 Everett      2330    ----   0730    ----   ----
 
 Wenatchee    0515    ----   1430    ----   ----
 
 Hoquiam      -----   0530   -----   -----  ----
 
 Yakima       ----    ----   -----   ----   ----
 
 Pasco   A    -----   0030   ----    ----   ----
 
 Pasco   L    ----    0700   ----    ----   ----
 
 Spokane      ----    1145   2200    1600   ----
 
 Missoula     -----   ----   ----    2220   2330
 
 Laurel       ----    ----   ----    ----   1400
 
 Billings     ----    ----   ----    ----   1500
 
 Minneapolis A 0330   0450   2340    0125   2210
 
 Minneapolis L 0915   1000   ----    ----   ----
 
 Chicago     A 2245   2330   ----    ----   ----
 
 Table 2. TOFC Service- Westbound
 
 Stations     33......3.....23......43
 
 Chicago     ----....1400..2330...-----
 
 Minneapolis ----....0045..----...----
 
 Spokane  A  ----....1005  1945   -----
 
 Spokane  L  1120....1105..2115...2045
 
 Seattle  A  ----....2145..----...0745
 
 Portland A  ----....----..0645...----
 
 Table 2B. Eastbound TOFC Service
 
 Stations............4.......PBF/182
 
 Portland  L.......----.......1800
 
 Seattle   L.......1930......-----
 
 Spokane   A.......----......1115
 
 Spokane   L.......----......1145
 
 Minneapolis A.....----......0450
 
 Chicago   A.......1500......2330
 
 These were just a few of the several hundred freight trains operating each day throughout the Burlington Northern system.
                                    All trains handled TOFC traffic as well as carload traffic, except those trains designated as TOFC/COFC only.
 
 PASSENGER SCHEDULES OF BN COMPONENTS.
 
 Table3.Great Northern Condensed 1969 Schedule for Nos31  and 32 THE EMPIRE BUILDER and Nos.27 and 28  THE WESTERN STAR.
 
 
 
 27.......31.......Stations........32..........28
 
 -----  1300...Lv Chicago..Ar....1455........-----
 
 -----..2000...Ar St.Paul..Lv....0810........-----
 
 0830...2035...Lv St.Paul..Ar....0710........1830
 
 0855...2100...Ar Minneapolis.Lv.0635........1800
 
 0905...2105...Lv Minneapolis.Ar.0630........1750
 
 1045...2238...Ar Willmar.....Lv.0430........1610
 
 1050...2240...Lv Willmar.....Ar.0425........1605
 
 1335...0117...Ar Fargo,ND....Lv.0100........1310
 
 1350...0130...Lv Fargo,ND....Ar.0050........1300
 
 1935...0500...Ar Minot,ND....Lv.2105........0710
 
 1950...0510...Lv Minot,ND....Ar.2050........0655
 
 2205...0725...Ar Williston...Lv.1835........0425
 
 2120...0635...Lv Williston...Ar.1725........0315
 
 0240...1135...Ar Havre,MT....Lv.1220........2100
 
 0300...1150...Lv Havre,MT....Ar.1205........2040
 
 0900...1800...Ar White Fish..Lv.0610........1430
 
 0910...1805...Lv White Fish..Ar.0600........1420
 
 1415...2315...Ar Spokane,WA..Lv.2310........0716
 
 1500...2345...Lv Spokane,WA..Ar.2240........0615
 
 1830...0310...Ar Wenatchee...Lv.1918........0220
 
 1840...0320...Lv Wenatchee...Ar.1910........0205
 
 2300...0745...Ar Seattle,WA..Lv.1500........2200
 
 
 
 Table4A.BURLINGTON ROUTE.Chicago to Denver. 1969 Timetable
 
 Westbound Service.
 
 Stations.........11.....17.......1........3
 
 Chicago  Lv.....1100..1440.....1735....2115
 
 Galesburg Ar....1355..1710.....2008....0030
 
 Galesburg Lv....1405..1712.....2010....0050
 
 Ottumwa,IA Ar...1608..1909.....2204....0308
 
 Ottumwa,IA Lv...1612..1916.....2206....0328
 
 Creston....Ar...1756..2048.....2345....0523
 
 Creston....Lv...1756..2048.....2345....0523
 
 Omaha,NE...Ar...2000..2245.....0129....0745
 
 Omaha,NE...Lv...----..2305.....0139....0815
 
 Lincoln....Ar...----..0005.....0239....0915
 
 Lincoln....Lv...----..0020.....0304....----
 
 Hastings...Ar...----..0158.....0440....----
 
 Hastings...Lv...----..0208.....0448....----
 
 McCook.....Ar...----..0425.....0645....----
 
 McCook.....Lv...----..0448.....0549....----
 
 Denver,CO..Ar...----..0800.....0800....----
 
 Table4B. Denver to Chicago
 
 Stations.......2..........18........12........4
 
 Denver....Lv.1500.......1920......------....----
 
 McCook....Ar.1830.......2313......------....----
 
 McCook....Lv.1934.......0022......-----.....----
 
 Hastings..Ar.2142.......0235......-----.....----
 
 Hastings..Lv.2148.......0244......-----.....----
 
 Lincoln...Ar.2305.......0424......-----.....----
 
 Lincoln...Lv.2329.......0434......-----.....1830
 
 Omaha.....Ar.0026.......0534......-----.....1930
 
 Omaha.....Lv.0036.......0554......1210......1955
 
 Creston...Ar.0220.......0740......1400......2159
 
 Creston...Lv.0220.......0740......1400......2159
 
 Ottumwa...Ar.0358.......0918......1545......2340
 
 Ottumwa...Lv.0400.......0920......1550......2340
 
 Galesburg Ar.0559.......1124......1800......0205
 
 Galesburg Lv.0602.......1126......1830......0225
 
 Chicago...ar.0850.......1405......2140......0530
 
 Note: These schedules do not comprise all the service Burlington operated on this route,but just the principal trains
                                    going beyond Ottumwa,Iowa. They were issued 4-27-69.
 BLOCKINGS FOR SOME OF THE TRAINS SHOWN HERE:
 Train 3, High priority freight was blocked as follows:
 CHICAGO
 1.Everett, CL (fill)
 2.Carload (Fill)
 3.Portland, TCF
 4.Seattle, TCF
 5.Spokane,TCF
 6.Fargo,TCF
 7.Caboose
 NORTHTOWN: Pick up on rear ahead of Group 4.
 Grouping:
 1.Spokane
 2.Portland
 3.Seattle
 At Fargo: Set off Group 6.Yardley,Set off Spokane TCF,
 Deliver Portland traffic to Train 33.
 Grouping for Train No.4
 1.Chicago and beyond, TOFC/COFC
 1.Chicago TOFC/COFC
 2.Caboose
 Blocking data came from 1982 BN Freight Schedule book in my library.
 |  |  |  |